Paint or powder over hot-dip galvanizing outlasts both coatings added together, but only when the zinc is prepared for it. Where the 1.5 to 2.3 synergy factor comes from and how the atmosphere sets it, a worked example on the Duplex Life Estimator, sweep blasting and the powder outgassing bake, and the 20 to 30 µm repaint trigger.

Two coatings that protect each other

A duplex system is hot-dip galvanizing with an organic coating over it: liquid paint, powder, or both. It is specified for three reasons: a design life that zinc alone cannot reach in the environment, a colour the client wants, or a colour the site needs for safety or identification. Done properly, it outlasts both of its parts added together. Done badly, the paint loses its grip on the zinc early, and the owner has paid for two coatings to get the protection of one.

This article covers the engineering behind that difference. What it settles:

Why the synergy works both ways

ISO 14713-1:2017 clause 6.5, "Duplex systems", states the effect directly. The total life of a zinc coating plus an organic coating "is usually significantly greater than the sum of the lives" of the two, and it gives the reason in both directions: the zinc reduces under-rusting of the paint film, and the paint preserves the zinc from early corrosion.

Each coating covers the other's weakness:

That is why the combination is not arithmetic. The paint lasts longer because it sits on zinc, and the zinc lasts longer because it sits under paint.

The synergy factor, and what sets it

Van Eijnsbergen gives the relationship as an empirical formula (Duplex Systems, Elsevier 1994, Chapter II, p. 7):

D(duplex) = 1.5 to 2.3 × [ D(zinc) + D(paint) ]

Here D is the durability in years of outdoor exposure until not more than five percent of the underlying steel surface has rusted. D(zinc) and D(paint) are the lives of the zinc coating and of the paint coating each applied directly to steel. On page 8 he sets the factor by atmosphere: about 1.5 in very aggressive atmospheres and 2.3 in less aggressive climates, with relative humidity and the duration of wetness also playing a part. His own example, from Fig. II-1: 70 µm of zinc in an industrial atmosphere lasts about 9 years, 100 µm of paint on bare steel about 3 years, and the duplex system about 18 years. That is the low end, 1.5 times the sum of 12 years.

The second source in this library gives a different band. The Handbook of Hot-Dip Galvanization (Maaß and Peißker, eds., Wiley-VCH 2011, §10.3, p. 353) writes the same relationship as protection periods multiplied by 1.2 to 2.5.

SourceFactorWhat sets the valueEnd point of "life"
Van Eijnsbergen, Duplex Systems, 1994, pp. 7 to 81.5 to 2.3The atmosphere: about 1.5 very aggressive, 2.3 less aggressive; humidity and wetness also countNot more than 5% of the steel surface rusted
Handbook of Hot-Dip Galvanization, 2011, §10.3, p. 3531.2 to 2.5Not stated"Protection period", not defined further there
ISO 14713-1:2017, clause 6.5None publishedSynergy confirmed in words onlyMaintenance before any steel rusting

Why do the bands differ? The handbook gives the formula without saying which conditions put a system at 1.2 or at 2.5, and without a definition of the end point, so the two bands are not measuring quite the same thing. Van Eijnsbergen's is the narrower band with a stated rule for choosing within it. That is why the site's Duplex Life Estimator uses 1.5 to 2.3.

Two cautions follow:

A worked example on the Duplex Life Estimator

Take a structure in a C5 atmosphere, galvanized to an 85 µm mean coating, with a paint system that would last about 10 years on blasted steel in the same place.

The zinc leg comes from ISO 14713-1:2017 Table 1, which gives zinc corrosion rates of 4.2 to 8.4 µm per year in C5:

Zinc life = 85 ÷ 8.4 to 85 ÷ 4.2 = 10 to 20 years (rounded, as ISO 14713-1 Table 2 does)
Sum of the parts = (10 + 10) to (20 + 10) = 20 to 30 years
Duplex life = 1.5 × 20 to 2.3 × 30 = 30 to 69 years

The Duplex Life Estimator returns exactly that, 30 to 69 years, because it applies 1.5 to the low end and 2.3 to the high end. Now apply Van Eijnsbergen's rule for the atmosphere. C5 is a very aggressive environment, so the factor sits near 1.5 at both ends:

Very aggressive atmosphere: 1.5 × 20 to 1.5 × 30 = 30 to 45 years

That is the number to plan with in C5. The upper part of the tool's range belongs to milder atmospheres. Run the same coating and paint in C4 and the tool returns 45 to 100+ years, with the zinc alone lasting 20 to 40 years. The tool shows the whole band in every category on purpose: the source gives no category mapping, so the choice within the band is the engineer's, and in an aggressive environment the honest choice is the low end.

Two things the example does not say. It does not say when the first repaint falls, which is the next section, and it does not hold if the preparation is wrong. A paint film that loses adhesion in the second year contributes nothing to the sum.

A longer life is not fewer visits

ISO 14713-1:2017 clause 6.5 makes a point that surprises owners. Maintenance usually takes place when a coating loses its appearance, and zinc usually takes longer to degrade than paint. So a zinc coating may be recommended for 20 years or more to first maintenance, while the same coating under paint is recommended for only 10 years, for reasons of the paint's appearance.

A duplex system buys durability, not freedom from maintenance. The first visit is usually a repaint for appearance, made while the zinc underneath is still intact, and that is the cheapest repaint there is: no rust to remove, only a weathered paint film over sound zinc. The same clause adds two practical notes:

ISO 12944-5 says something similar from the paint side. Its Annex B note on paint systems over hot-dip galvanized steel says that the durability given for such a system relates to the paint's adhesion to the galvanized surface, and that where the paint is damaged, the remaining galvanized layer still protects the steel. A durability class from ISO 12944 is therefore a statement about the paint, not a life for the duplex system.

When to repaint: measure the zinc

ISO 14713-1:2017 clause 6.5 gives the one hard number in this subject. If the life of the zinc coating is to be prolonged, maintenance has to take place before any steel rusting occurs, and preferably while at least 20 to 30 µm of zinc coating remains. If maintenance waits until the zinc is consumed and rust has started, the clause says, the steel has to be maintained in the same way as rusted painted steel, and the duplex advantage is gone.

In practice:

Van Eijnsbergen makes the same point from the maintenance side (p. 9): when only a weathered zinc layer remains and there is no rust, the structure can be reconditioned safely, without relying on doubtful derusting. The cleaning must leave that zinc intact. For weathered duplex structures he recommends low-pressure wet blasting at 1 to 2 bar for large structures such as towers and halls (p. 59), and notes that high-pressure water jets below 100 bar leave the zinc intact while pressures of 400 bar and upwards attack and remove it (p. 60).

Order it as a duplex system

The galvanizer has to know. ASTM A123/A123M-24 sections 6.2 and 6.4 say that the surface roughness of articles to be painted or powder coated, and any smoothing of the coating before coating, shall be mutually determined by the galvanizer and the purchaser. Further preparation, including cleaning, profiling and outgassing, shall follow ASTM D6386 for paint and ASTM D7803 for powder, and is the responsibility of the paint or powder applicator.

The 2011 handbook (§10.5, p. 355) puts the same duty the other way round: the galvanizing shop needs to know the intended duplex design and the intended surface preparation method, because some normal after-treatments spoil adhesion. It names oiling or waxing, and water-bath cooling with white rust formation. ASTM D7803-12 section 5.1.2 says adhesion problems have been experienced on newly galvanized work that was water quenched or chromate treated, and that neither treatment is recommended for work that is to be coated.

What follows for the galvanizer:

Preparing galvanized steel for paint

What has to come off

Fresh zinc reacts with air at once. The handbook (§10.6.1, Table 10.1, p. 357) sorts the products: zinc oxide and zinc carbonate are not critical for adhesion, but zinc hydroxide, chlorides and sulfates are, and all of them look white to light grey, so they cannot be told apart by eye. On the same page it says that weathering the zinc before painting, once common practice, is no longer recommended, because the adhesion-friendly patina cannot be guaranteed or tested.

So preparation has to remove whatever has formed, whether or not it can be seen, together with oil, marker, flux residue, ash and blasting dust.

Sweep blasting

Sweep blasting is a light blast with a fine, non-metallic abrasive that cleans the zinc and roughens it slightly without stripping it. The handbook (§10.6.3.1, p. 359) calls it the safest preparation method and generally applicable. The two sources give close parameters:

ParameterVan Eijnsbergen 1994Handbook of Hot-Dip Galvanization 2011
Air pressure1.5 to 2.5 bar (p. 68)Up to 0.3 MPa, which is 3 bar (p. 359)
Nozzle distance40 to 50 cm (p. 68)0.5 to 0.8 m (p. 359)
AngleA lower angle on alloy-layer coatings (p. 68)30° (p. 359)
AbrasiveFine inert grit, 0.2 to 0.5 mm (p. 67)Non-metallic, 0.2 to 0.5 mm (p. 359)
Zinc removed8 to 13 µm, average 10 µm (p. 71)10 to 15 µm (p. 359)
ResultA very homogeneous, rough zinc surface (Fig. V-8, p. 69); the normal procedure removes less than 13% of the coating (p. 71)Matt grey surface, roughness grade "fine" to ISO 8503-1 (p. 359)
Time to first coatLess than 48 hours after galvanizing in practice, the shorter the better; paint immediately after sweeping (pp. 67, 71)Immediately after sweeping, at the latest within 24 hours (p. 360)

Three points from the same pages decide whether the coating survives the blast:

Measure before and after. The coating thickness that matters to the owner is the one left under the paint, and the methods are the ones in the coating thickness article.

When the steel has waited

The handbook (§10.6.4.1, pp. 363 to 364) sorts liquid painting by how long the zinc has waited:

Its conclusion is the useful one for any project: workshop painting straight after galvanizing, or after a short wait, is preferred even when sweep blasting is needed.

Preparing it for powder

Powder adds heat, and heat brings the zinc's trapped gases out. ASTM D7803 is the practice for it. The copy on file is D7803-12; ASTM has since published later editions, so check the contract's edition before quoting the clause numbers below.

Its scope covers new, partially weathered and fully weathered galvanized surfaces on articles galvanized after fabrication, not sheet or coil. Section 4.3 explains the failure it is written to prevent: gases trapped during galvanizing escape through the coating as the powder cures, and unless they are driven out first, the result is pinholes or blisters. Pinholes let chlorides reach the zinc, and the zinc corrosion products can then bleed through as white staining.

The sequence D7803-12 sets out:

  1. Classify the surface. Newly galvanized means within the previous 48 hours, with no quench or chromate treatment and no visible white oxide or hydroxide (section 5.1). Older work is partially weathered; work exposed for six months or more, with a surface mainly of zinc carbonate, is fully weathered (sections 5.2 and 5.3).
  2. Smooth and clean. Level high spots and drip lines with hand or power tools, check the thickness, and remove oil and grease (sections 5.1.1 and 5.1.2). Test for a chromate coating if the galvanizer has not said one was avoided (section 5.1.2.1).
  3. Profile by one of three methods (section 5.1.3): sweep blasting to SSPC-SP 16, whose purpose is "to deform, not remove" the zinc, with the work kept at least 3 °C above the dew point; phosphating; or grinding and sanding with no more than 25 µm removed.
  4. Coat soon. Fresh zinc oxide forms quickly in humid or hot conditions and cannot be seen, so the powder goes on as soon as possible after preparation.
  5. Outgas before powdering (section 6.1). Pre-bake the work in an oven that can heat it to 30 °C above the curing-oven temperature, held until the surface reaches it, typically one hour. If the work was phosphated, keep the pre-bake at or below 280 °C, or the phosphate layer breaks down.
  6. Cool and coat. Cool the work to sufficiently below the curing temperature before the powder is applied.
  7. Inspect each layer on its own. The galvanized coating must meet A123 or A153 in full, and the zinc and the powder thicknesses are measured independently (section 7.1).

The pre-bake differential is the step plants most often drop, because it costs oven time. It is also the step that decides whether a powder coat over galvanizing has pinholes.

What to put in the order

For the purchaser and the specifier, a duplex order needs the following, in writing:

Related reading in this library:

Sources, from the author's own copies:

The figures apply to batch galvanizing of fabricated articles. The paint or powder supplier's data sheet governs its own product, and the edition named in the contract governs the standards.

AM
Aladdin Mohammed
Hot-Dip Galvanizing Specialist · Operations Manager
Galvanizing engineer with more than twenty years in hot-dip galvanizing, currently running three plants. Author of the HDG Community technical library and developer of the Vent and Drain Hole Planner and the Pickling Optimizer.

© Aladdin Mohammed · HDG Community. Figures are quoted from ISO 14713-1:2017, ASTM A123/A123M-24, ASTM D7803-12, ISO 12944-5:2018, J.F.H. van Eijnsbergen's Duplex Systems (1994) and the Handbook of Hot-Dip Galvanization (2011), for batch galvanizing of fabricated articles. Duplex lives are planning estimates, not warranties. Nothing here replaces the governing standard, the coating supplier's data sheet or the edition named in the contract.